This Mallard Record Breaker Train Set includes the famous locomotive
Two TOPS classifications were used to distinguish between the two engine types
This kit stands out for its attention to detail and extensive equipment
Great Western Railway Livery
Our locomotive is driven by rubber bands and a gear array instead of superheated steam
R4965A LMS Stanier Coronation Scot 57' No.8993 RTO Coach option-set-220 This Mallard Record Breaker TrainIn response to the London & North Eastern Railway's 'Coronation' sets which were hauled by their A4 Pacific locomotives, the London, Midland, Scottish Railway Board announced the advent of a similar train, the 'Coronation Scot', to run over their route. This would be covering the 4 miles between Euston and Glasgow in 6 hours, at an average of 61. 7 miles an hour. The train ran non stop between Euston and Carlisle, covering the 299. 1 miles in 4 hours,